Infrastructure Migration

Data Center Migration

Complete physical infrastructure relocation to Data4 Madrid, a Tier III+ data center with ISO 27001 and SOC2 certifications. New network architecture and redundant connectivity.

Project Overview

business

Technology

Industry

timer

6 wks

Duration

dns

20+

Servers

speed

99.99%

Target SLA

The challenge

The client's current data center did not meet the standards needed to sustain growth and regulatory demands.

verified

No certifications

The existing data center lacked ISO 27001, SOC2 or ENS certifications, making regulatory compliance and acquiring regulated-sector clients difficult.

warning

Downtime risk

The physical relocation of servers posed an inherent risk of disruption. The plan needed to minimize the downtime window as much as possible.

lan

Limited connectivity

The previous location had a single connectivity provider, with no redundancy or direct peering with major national carriers.

trending_up

Exhausted capacity

The company's projected growth exceeded the available power, cooling and rack space capacity at the current facility.

The solution

We planned a phased relocation to Data4 Madrid with new network architecture and full redundancy.

The project started with a complete audit of the existing infrastructure: hardware inventory, network dependency mapping, critical service analysis and definition of viable maintenance windows for each server group.

The physical relocation was executed in planned waves during weekends, with specialized IT equipment transport. At Data4 Madrid, racks were pre-prepared with dual power feeds, network cabling and BGP connectivity through our AS205081.

The new network architecture was designed with redundant connectivity, direct peering with major carriers and significantly lower latency to major national and international exchange points.

Project components

check_circle

Data4 Madrid (Alcobendas), Tier III+ with ISO 27001 and SOC2 certifications

check_circle

Dual-path power with redundant UPS and generator

check_circle

BGP multihoming connectivity via AS205081 with direct peering

check_circle

Specialized transport and rack mounting with individual verification

check_circle

Network reconfiguration with minimal downtime through planned waves

check_circle

Post-migration validation and complete performance testing

Results

The relocation was completed within the planned timeframe with significant improvements across all key indicators.

99.99%

SLA achieved

40%

Latency improvement

20+

Servers migrated

ISO

27001 Compliant

Need to relocate your infrastructure?

We plan and execute data center migrations with minimal downtime. Data4 Madrid, Tier III+, with the certifications your business needs.